Criteria for Consideration for AED approval at MSU (central campus)
- Interest on part of unit, or recommendation from Central administration, (Poston, Wilcox,) after discussion.
- Significant data that indicate that population in building has a significant high proportion of people over 55-60 in the building.
- Data that indicate time for EMS arrival is over 3-4 minutes the majority of the time, or prolonged construction that impairs EMS access.
- Activity in the building that significantly increases the likelihood of cardiac arrythmia’s that are life threatening.
- Regulatory requirement for AED for grant funding or accreditation
- Commitment to providing records on a yearly basis that documents training of employees and regular equipment maintenance records.
- Commitment to MSU’s designated vendor
- Consistency and interface with East Lansing and Meridian EMS.
- Tamper proof wall-mounted containers for AED's.
- Other
Download a Request for AED. (Adobe PDF)
Complete policy and both forms (PDF)
Updated: 7/15/08


